    Waitings dedication to excellence

    As a team, our people demonstrate how the commitment to a common vision can acheive the most ambitious of goals...
  • dumper

    Bergmann Tracked Dumper

    We are committed to a ‘continual investment’ programme for plant and machinery. All Plant is maintained to and beyond manufacturers recommendations and kept on a time set renewal basis. This means we have the most current modern fleet available to the workforce, this complements our client’s requirements in delivering projects effectively. The latest addition to our specialist fleet is a Bergmann 10t Low Ground Pressure tracked dumper. This is the latest generation of tracked dumpers and is a true 10t capacity truck. This truck at £125,000.00 further demonstrates our commitment to our clients in developing our business to meet their requirements. It also compliments our growing fleet of low ground pressure vehicles to cater for all conditions we encounter on the cross country projects.
  • t4

    Tier4i powered machines

    As part of our Plant Investment and renewal, we take benefit from the latest efficient engines from the mainline manufactures. The latest excavators from JCB use the compliant Tier 4i diesel power plants. These engines deliver more power than previous and use less fuel. The engines are the latest generation and complement our drive to reduce the business’s carbon footprint. This all contributes to our sustainability drive and further supports our clients requirements.

Projects

Turton Pike 1
Turton Pipe Bridge

This was a small but vital project located within a housing estate, and was to solve a sewage problem that…

Read More ›

Keenan Park 1
Carlisle City Council – Keenan Park, Carlisle

In May 2016 we were requested by a new local client, Carlisle City Council to assist with improving the play…

Read More ›

Hartlepool 2
Victoria Quays Berthing Pontoon at Hartlepool Docks

We are coordinating the installation of Hartlepool’s dockside berthing pontoon at Victoria Quays. Approached by EDF, we are assisting with…

Read More ›

All Projects

News

Thursday 23rd June 2016

Waiting for their man (and his Superbike!) – Press release
Superbike rider and Waitings Drainage employee, Keith Farmer brought a much anticipated special visitor into work yesterday … his Honda...

Posted by amanda

Read More ›

Monday 20th June 2016

Turton Pipe Bridge
This was a small but vital project located within a housing estate, and was to solve a sewage problem that...

Posted by amanda

Read More ›

Tuesday 7th June 2016

Amazing statistics from Ray Wind Farm project!
Progress is going well at Ray Wind Farm, and the weather is on our side for the time being. The numbers...

Posted by amanda

Read More ›

Tuesday 7th June 2016

Gently does it …
We are coordinating the installation of Hartlepool’s dockside berthing pontoon at Victoria Quays.  Andrew, our Contracts Manager is overseeing this project. Last...

Posted by amanda

Read More ›

Monday 6th June 2016

A great weekend had by all – Cubs Centenary
Catching up with our ‘Wolf camp’ –  a great time was had by all this weekend (3-5th June) and as...

Posted by amanda

Read More ›